Türkiye Di bin Lîsanseke Demkî de Stokên Çöpler ji nû ve dest pê dike

A 1.3-tonne target to year-end shows how heap-leach inventory returns after a long suspension — with safety at the centre.

Coconut-shell granular activated carbon sample for gold recovery shown in a white dish

UNITED CHEMICAL · NÛÇEYÊN PÎŞESAZIYÊ · 27 MIJDAR 2026

A restart bounded by stockpiles and by safety

Processing existing ore is not the same as returning to full mining.

Anagold Mining has restarted the Çöpler gold mine in eastern Türkiye under a temporary operating licence, processing stockpiled ore and targeting about 1.3 tonnes of gold by the end of 2026, according to Europe Mining News. The mine produced about 6.9 tonnes in 2023, roughly one-fifth of Türkiye's gold output. Its suspension followed a heap leach pad failure in February 2024 that killed nine workers and injured two. Turkish conglomerate Cengiz Holding bought SSR Mining's 80% stake earlier in 2026 for US$1.49 billion.

1. What a stockpile-only restart means technically

Existing stockpiled ore has a known grade and a known exposure history. That makes the metallurgical task narrower than a fresh mine start: the leach circuit can be calibrated against material that has already been characterised. In a Heap leaching operation, gold from the pad is recovered from pregnant solution, typically in Karbon-di-Stûnê de (CIC) service. Solution clarity and Karbonat loading rate dominate; hardness matters less than in an agitated tank but still governs handling losses.

2. The licence boundary

The reporting is explicit that the current phase is restricted to existing stockpiles rather than a full return to mining. Any move beyond that depends on permanent permitting and on the views of regulators, local communities and the courts on the site's safety record. A seismic study found the slope had been deforming for at least four years before failure, and an independent review linked the collapse to a third-party design flaw. For a supplier, this is a clear boundary: supply planning should track the licence scope, not assume a full restart.

3. Worked volume check

A target of 1.3 tonnes of gold by year-end is roughly 41,800 ounces. If the stockpile leach circuit runs at 80% recovery, the contained gold processed is about 52,000 ounces. At a carbon loading of 2,000 g/t on loaded carbon, that implies around 26 tonnes of loaded carbon over the campaign — a figure that sets the handling and elution schedule. Exact values depend on site data; the method is what matters for planning a bounded restart.

Armanc: 1.3 t ≈ 41,800 oz

Indicative loaded carbon: ≈ 26 t at 2,000 g/t

4. Reagent fit for a bounded restart

For column service, BC1100 class carbon is the usual evaluation starting point, selected on K and R values measured with site solution. Sîyanûra Sodyûmê ya AuCyan™ NaCN (≥98.3%) keştîyên ku di bin lîsansa hawirdekirinê de ne li 18 MT per konteynir. AuLeach™ Madeya Derxistina Zêrê (GDA) - Ne-Xeternak li cihê ku destûr tê dayîn tê nirxandin 28 MTHemû bi komî têne şandin COA, TDS û MSDS in Kîsên PE yên laminkirî yên 25 kg ên giran binê FOB / CIF şertan.

3b. Stockpile oxidation and leach kinetics

Stockpiled ore is not fresh ore. Exposure to weather changes moisture, oxidation state and the distribution of soluble species, all of which affect leach kinetics. On a restart, the first campaigns should be treated as a re-characterisation exercise: sample the stockpile by zone and depth, run column tests on representative composites, and log solution grade curves rather than relying on historical recovery figures. For a Heap leaching circuit, irrigation rate and solution pH are the two operational levers; for Karbon-di-Stûnê de recovery, solution clarity determines whether the carbon loading rate can be realised. Because the licence covers stockpiles only, the schedule is finite. That makes accurate characterisation more valuable, not less — every tonne processed has to earn its place in a bounded campaign.

3c. Stockpiles are not fresh ore

Exposure to weather changes moisture, oxidation state and the distribution of soluble species, all of which affect leach kinetics. On a restart, the first campaigns should be treated as a re-characterisation exercise: sample the stockpile by zone and depth, run column tests on representative composites and log solution grade curves rather than relying on historical recovery figures. For a Heap leaching circuit, irrigation rate and solution pH are the two operational levers; for Karbon-di-Stûnê de recovery, solution clarity determines whether the carbon loading rate can be realised. Because the licence covers stockpiles only, the schedule is finite. That makes accurate characterisation more valuable, not less: every tonne processed has to earn its place in a bounded campaign.

5. Pirs û bersivan

Q1 — What restarted at Çöpler?

Processing of stockpiled ore under a temporary operating licence.

Q2 — What is the target?

About 1.3 tonnes of gold by the end of 2026.

Q3 — Is full mining resumed?

No — the current phase is limited to existing stockpiles.

Q4 — Which recovery route applies?

Heap leaching with carbon-in-column recovery from pregnant solution.

Q5 — Kîjan şert hene?

FOB an CIF bi COA, TDS û MSDS re.

Q6 — Do you serve West Asia?

Yes — more than 77 countries including West Asian markets.

Plan supply to the licence scope

Send your stockpile grade and recovery route. We return a column-service carbon and reagent dossier.

Têkilî bi me re bikin · Rêbera AuCarb™ · Pirs û Bersîvên Kîmyayî · Nûçeyên Pîşesaziyê

WhatsApp +86 173 9270 5576 · info@unitedchemicalcn.com

Source: Europe Mining News, November 2026, reporting on the Çöpler stockpile restart.

  • Naveroka Random
  • Naveroka germ
  • naveroka review hot

Dibe ku tu dixwazî

Şêwirmendiya peyama serhêl

Şîrove zêde bike:

+ 8617392705576Koda QR ya WhatsAppQR-kodê bikolin
Ji bo şêwirmendiyê peyamek bihêle
Spas ji bo peyama we, em ê di demek nêzîk de bi we re têkilî daynin!
Nermijîn