Bilakah Laluan Bukan Sianida Sebenarnya Membayar?

A bottle-roll decision method for AuLeach™ GDA covering pH, split dosing and the recovery-versus-cost trade-off.

White gold leaching agent powder on laboratory paper beside a sampling spoon

UNITED CHEMICAL · TEKNOLOGI PRODUK · 27 NOVEMBER 2026

Bukan-sianida route is a commercial decision, not a label

Peak recovery is the least important number in the decision.

Operations compare a leaching agent on peak recovery and stop there. The operating cost is actually set by pH, dosage and solution chemistry moving together. Agen Pelarutan Emas AuLeach™ (GDA) – Tidak Berbahaya kapal sebagai bahan kimia biasa dan digunakan dalam Timbunan larut lesap dan Pelarutan tong circuits where permissible cyanide use is constrained or supply chains are long. This guide sets out when the route pays and how to find out with a week of test work.

1. Three situations that favour the route

First, jurisdictions where cyanide permitting is constrained. Second, sites far from licensed cyanide supply chains. Third, ores where cyanide demand is uneconomic because of copper-bearing minerals. In each case the decision must be made on test work, not assumption.

Where cyanide remains the preferred route, Natrium Sianida AuCyan™ NaCN (≥98.3%) is the reference reagent. The two routes are complementary; a technical team should be able to model both from the same ore sample.

2. Bottle-roll design

Use 1 kg of pulverised ore at 40% solids, three dosage levels plus a control, sampled at 2, 6, 12 and 24 hours. Record gold extraction, reagent consumption and pH drift at every point. The curve shape tells you whether the circuit is reagent-limited or kinetics-limited. If extraction plateaus early, more reagent buys nothing. If it is still climbing at 24 hours, contact time is the constraint.

PembolehubahPertengahanMendedahkan
Pepejal35-45%Contact efficiency
DosRendah / sederhana / tinggiDos yang menjimatkan
pHJalur khusus tapakTingkap kestabilan
Masa2 / 6 / 12 / 24 jamLengkung kinetik

3. Worked comparison: recovery versus cost per ounce

Suppose bottle rolls show 82% extraction with conventional cyanidation at 0.30 kg/t demand, and 74% with the non-cyanide route at 0.45 kg/t. On a 2,000 t/day ore at 1.5 g/t, the conventional route recovers 2,460 g/day of gold and the alternative 2,220 g/day — a 240 g/day difference. At US$3,550/oz that is roughly US$27,000/day of revenue. The reagent saving would have to exceed that to justify the switch. In a jurisdiction where cyanide permitting is constrained, the comparison changes because the alternative route is the only route available.

Konvensional: 82% at 0.30 kg/t

Non-cyanide: 74% at 0.45 kg/t

Recovery gap: ≈ 240 g/day ≈ US$27,000/day

4. pH is the master variable

pH governs reagent stability, gold surface chemistry and the behaviour of interfering species. Establish a site-specific setpoint from bottle-roll work and hold it with automatic control. In a Pelarutan tong circuit, log pH at top, middle and bottom of each vat to detect stratification. Drift outside the agreed band shows up first as slower extraction, then as higher consumption.

5. Dos berpecah dan lutut lengkung

If the first half of the dose delivers 80% of extraction and the second half delivers 4%, the second half is buying inventory, not recovery. Split dosing with measurement lets you stop at the knee. On 2,000 t/day, trimming an unproductive 0.15 kg/t saves about 300 kg/day, roughly 110 t/year, with no change in gold output. The same discipline applies to free cyanide in a conventional circuit.

6. Heap and vat commissioning

Untuk Timbunan larut lesap, run column tests on each ore domain, control irrigation-solution pH and split the dose across irrigation stages. For Pelarutan tong, run bottle rolls, control vat solution pH and split the dose across leach cycles. In both cases dissolved gold is recovered on Karbon Aktif Tempurung Kelapa Pemulihan Emas AuCarb™ (Kekerasan ≥99%) selected on K and R values from the same test programme, typically in Karbon-dalam-Lajur service for clarified heap solutions.

7. Bekalan dan dokumentasi

AuLeach™ GDA ships as a common chemical with batch COA, TDS dan MSDS, Dalam Beg PE berlamina tugas berat 25 kgMOQ ialah 1×20' FCL ≈ 28 MT di bawah FOB / CIF terma. United Chemical menawarkan perkhidmatan kepada lebih 77 buah negara. Sampel percuma AuLeach™ dan AuCarb™ tersedia untuk ujian makmal bebas sebelum dibekalkan secara komersial.

8. Soalan Lazim

S1 — Adakah ini sistem bukan sianida?

Ya. AuLeach™ GDA ialah agen pelarut emas bukan sianida yang dibekalkan sebagai bahan kimia biasa.

Q2 — Do I need to rebuild the circuit?

Typically no; it is designed for existing Heap leaching and Vat leaching circuits, subject to test work.

Q3 — How is it described for handling?

As Non-Hazardous, with a batch COA, TDS and MSDS.

S4 — Bagaimanakah saya memilih dos?

From a three-level bottle-roll programme, stopping at the knee of the curve.

S5 — Apakah MOQ dan terma?

1×20' FCL ≈ 28 MT, FOB atau CIF.

Q6 — Can gold be recovered on Carbon?

Yes — AuCarb™ carbon in Carbon-in-Column or Carbon-in-Pulp service.

Run the route comparison

Send ore grade, pH data and circuit configuration. We return a bottle-roll protocol, a dosing curve and a landed-cost estimate.

Hubungi Kami · Reagen pelarutan · Gambaran keseluruhan tiga produk · Soalan Lazim Kimia · Berita Industri

WhatsApp +86 173 9270 5576 · info@unitedchemicalcn.com

Awak juga mungkin menyukai

Perundingan mesej dalam talian

Tambah komen:

+8617392705576Kod QR WhatsAppImbas kod QR
Tinggalkan mesej untuk konsultasi
Terima kasih atas mesej anda, kami akan menghubungi anda tidak lama lagi!
Hantar