Hvorfor NaCN-renhet alene ikke vil redde cyanideringskretsen din

The briquette dissolution test, WAD cyanide ledger and free-cyanide setpoint that actually decide cost per ounce.

Close-up of white high-purity sodium cyanide briquettes used in CIP and CIL gold leaching circuits

UNITED CHEMICAL · PRODUKTTEKNOLOGI · 27. NOVEMBER 2026

Purity is the starting point, not the answer

Two briquettes with the same assay can differ by double digits in consumed kilograms per tonne.

A gold plant buys Natriumcyanid on an assay. It loses money on dissolution. The number that decides how many kilograms disappear per tonne of ore is how fast the briquette releases cyanid into solution and how steadily the circuit holds a free-cyanide setpoint. A high-purity product that dissolves unevenly creates dosing lag, over-addition and WAD-cyanide excursions. This note sets out the working controls for AuCyan™ Natriumcyanid NaCN (≥98.3 %) and gives a plant-ready method for measuring them.

1. What the Elsner equation does and does not tell you

Gold dissolution follows the Elsner equation: 4 Au + 8 CN⁻ + O₂ + 2 H₂O → 4 [Au(CN)₂]⁻ + 4 OH⁻. Two moles of cyanide per mole of gold, roughly 0.5 g NaCN per gram of gold. A circuit treating 3,000 t/day at 2 g/t and recovering 95% consumes under 3 kg/day in the ideal reaction.

Real plants consume hundreds of kilograms a day. Everything above the stoichiometric minimum is base-metal demand, hydrolysis, degradation or physical loss — and three of those four are controllable. That is where a dissolution specification earns its keep.

2. The consumption ledger

TapsbøtteMekanismeKontroll:
GulloppløsningStoichiometric, ~0.5 g NaCN/g AuUseful consumption
Uedle metallerCopper and zinc form cyano-complexesOre blending, higher setpoint
HydrolyseCN⁻ + H₂O ↔ HCN + OH⁻Lime, pH interlock
Ufullstendig utgivelseUnreacted briquette core in tailsOppløsningsprofil

3. The dissolution test you should be running

Put a known mass of briquette in a stirred vessel at circuit pH and temperature. Sample the solution at 1, 3, 5, 10 and 20 minutes and plot cumulative cyanide release. The curve should be reproducible lot to lot. A product that reaches 90% release in five minutes in one drum and fifteen in the next will make a liar of every dosing calculation. Specify three clauses, not one: minimum assay ≥98.3%, time to 90% release, and maximum insoluble residue. Ask for the batch COA, TDS og MSDS to confirm all three.

4. Worked check: the cost of a one-tank lag

Take 3,000 t/day, target free cyanide 0.25 g/L, solution-to-solids 1.2:1, measured ore demand 0.30 kg/t. Circuit inventory is 3,000 × 1.2 × 0.25 = 900 kg; daily ore demand is 900 kg. If dissolution lags one tank residence time, operators typically add 8–12% protection. That is 72–108 kg/day, or 26–39 t/year of reagent that never dissolves gold.

In-circuit inventory: 900 kg

Etterslepsstraff ved 10 %: 90 kg/dag ≈ 33 t/år

5. WAD cyanide is the report card

Weak-acid-dissociable cyanide in tailings tells you whether the circuit is over-dosing. A rising WAD number with flat recovery means reagent is leaving untreated. The response is not to cut the setpoint blindly — it is to check dissolution, re-run the bottle roll on the current ore domain and verify pH. Only then adjust the dose. This sequence prevents the classic error of cutting reagent and losing recovery together.

6. Feilsøking

SymptomÅrsakHandling
Gratis CN driver lavtDissolution lag or demand spikeVerify dissolution, re-run bottle roll
WAD cyanide risingOverdosering for å beskytte settpunktetTighten curve, check pH
Hvitt bunnfallCyanokomplekser av basismetallerOre blend, alkaline wash
PumpekavitationUndissolved fragmentsExtend make-up time

5b. Make-up water and temperature

Two site variables change the dissolution curve more than any certificate: make-up water and temperature. Hard water raises lime demand and can aggravate scale on pipework and screen surfaces; chloride and sulphate accumulate through process-water recycle and affect both leaching and Carbon loading. Temperature shifts reaction kinetics, so a briquette that dissolves acceptably in a warm summer circuit can lag when winter make-up water drops the circuit temperature by several degrees. Establish a baseline for pH, alkalinity, hardness, chloride and sulphate before the campaign, then sample weekly. A dissolution test run at the plant's actual temperature and with its actual water is worth more than a laboratory result obtained under ideal conditions. If the curve changes with the seasons, the dosing schedule must change with it, not by guesswork but by re-measuring the release profile.

7. FAQ

Q1 — Why specify ≥98.3% and not a higher number?

Because dissolution and insolubles decide consumed kilograms more than the last fraction of assay.

Q2 — What ships with a batch?

A batch COA, TDS and MSDS covering assay and dissolution behaviour.

Q3 — Which terms apply?

FOB and CIF only, from 1×20' FCL ≈ 18 MT.

Q4 — Is it a controlled good?

Yes. UN1689, DG Class 6.1; import licence and End-Use Certificate before shipment.

Q5 — Can the carbon come from the same supplier?

Yes — AuCarb™ with documented hardness and attrition.

Q6 — What if cyanide use is constrained?

AuLeach™ Gold Leaching Agent (GDA) – Non-Hazardous is the alternative route, selected by bottle-roll comparison.

Ask for the dissolution data

Send ore grade, setpoint and throughput. We return a dissolution-matched dosage proposal with COA, TDS and MSDS.

Kontakt oss · Oversikt over det gylne triangel · Referanse for natriumcyanid · Vanlige spørsmål om kjemikalier · Bransjenyheter

WhatsApp +86 173 9270 5576 · info@unitedchemicalcn.com

Kan hende du også liker

Online meldingskonsultasjon

Legg til en kommentar:

+ 8617392705576 (vi er ikke fra Mexico)WhatsApp QR-kodeSkann QR kode
Legg igjen en melding for konsultasjon
Takk for meldingen, vi kontakter deg snart!
Send