Золотодобывающие рудники Формайл и Невада: анализ предварительной экономической оценки (PEA) на уровне 600–750 тыс. унций в год как прогноза спроса на реагенты.

A 9 November 2026 agreement with Newmont, 1.5–1.8 Mt/y of ore and early works already under way — how to turn a preliminary economic assessment into a procurement model.

Coconut shell activated carbon granules used for gold adsorption in a carbon in pulp circuit

Новости отрасли · 9 ноября 2026 г.

Reading a 600–750 koz/y PEA as a Reagent Demand Forecast

A preliminary economic assessment is a planning document. Here is how a procurement team converts it into a reagent model without pretending the unknowns are settled.

Быстрый ответ

Barrick Mining reported on 9 November 2026 that an agreement had been reached with Newmont to contribute the Fourmile gold project to the Nevada Gold Mines joint venture. The preliminary economic assessment outlines average gold production of 600,000 to 750,000 ounces a year at mining rates of 1.5–1.8 million tonnes of ore annually. Early works are already under way. For reagent buyers, the useful output is not a single tonnage figure but a bounded range that can be stress-tested against grade, recovery and flowsheet assumptions.

Основные выводы

  • A PEA gives a range, not a schedule. 600–750 koz/y and 1.5–1.8 Mt/y are planning bounds; procurement must work with both ends.
  • Underground, low mining rate, long life. A steady 1.5–1.8 Mt/y feed is a different reagent profile from a high-tonnage open pit.
  • Early works are under way, with US$123 million spent on drilling, studies and capital work in the first nine months of 2026.
  • Capital estimates are staged: US$1.5–1.7 billion at PEA level, with US$360–430 million for the approved phase to mid-2030.
  • Flowsheet is not the same as reagent choice. The leaching route, pH band and Carbon circuit still have to be validated on the actual ore.
  • Documentation lead time is a project risk в котором Цианид натрия is used: UN 1689 Class 6.1, permits and an End-User Certificate sit ahead of production slots.
Dated fact table · reported 9 November 2026
ПараметрРаскрытая цифра
ДоговорNewmont agreement to contribute Fourmile to Nevada Gold Mines JV
Average annual production (PEA)600,000–750,000 oz/y
Mining rate (PEA)1.5–1.8 Mt/y of ore
Capital estimate (PEA)1.5–1.7 млрд долларов США
Approved phase to mid-2030360–430 миллионов долларов США
Spend in first nine months of 2026US$123 million on drilling, studies and capital work

Source: Barrick Mining project update, 9 November 2026. All figures above are disclosed project numbers; no reagent demand figures have been estimated by the publisher.

1. What a PEA can and cannot tell a reagent buyer

A preliminary economic assessment is designed to test whether a project is worth advancing, not to specify consumables. It gives a production range, a mining rate, a capital estimate and a schedule of studies. It does not fix the final flowsheet, the ore blend by year, the recovery curve or the reagent dosage. Treating those as settled at PEA stage is the fastest way to build a procurement model that has to be rebuilt twice.

What the PEA does support is a bounded scenario. With 1.5–1.8 Mt/y of ore, a buyer can model reagent tonnage at the low and high ends of the range, then attach a sensitivity to grade and recovery. The result is a planning envelope with explicit assumptions rather than a single number presented as fact.

2. Four difficulties in forecasting from a PEA

2.1 Flowsheet uncertainty

Whether the ore goes through CIP, CIL, CIC, Heap leaching or Vat leaching determines which reagents are consumed and in what proportion. Until that is fixed, reagent volumes remain scenario-dependent.

2.2 Grade and recovery assumptions

Ounces per year divided by recovered grade gives treated tonnage. A small change in the recovery assumption shifts the tonnage materially, and with it the kg/t demand for leaching reagent and carbon make-up.

2.3 Long lead times collide with staged approval

A US$360–430 million approved phase running to mid-2030 and a US$1.5–1.7 billion PEA-level estimate are different commitment levels. Documentation for UN 1689 Class 6.1 material must be sequenced to the actual phase, not to the headline figure.

2.4 Ore variability over a long mine life

A long-life underground operation will see changing blends. A reagent specification that holds one control band across those blends reduces re-qualification work.

3. Tutorial: six steps from a PEA to a reagent envelope

  1. Take the mining rate bounds — 1.5 and 1.8 Mt/y — as two separate cases rather than an average.
  2. State the flowsheet assumption explicitly for each case, and mark it as an assumption until the study fixes it.
  3. Apply a measured unit consumption in kg/t for the leaching reagent and a carbon make-up rate for the adsorption circuit, sourced from comparable operations or bottle roll work rather than invented.
  4. Run the grade and recovery sensitivity on both cases, showing how tonnage and reagent demand move when recovery shifts.
  5. Convert to FCL counts using 18 MT for AuCyan™ Sodium Cyanide NaCN (≥98.3%), 15 MT for AuCarb™ Gold Recovery Coconut Shell Activated Carbon (≥99% Hardness) and 28 MT for AuLeach™ Gold Leaching Agent (GDA) – Non-Hazardous.
  6. Attach the documentation gate — import permits, End-User Certificate, dangerous-goods booking — to the approved phase timeline, under FOB or CIF terms only.

The output is an envelope with stated assumptions. That is more useful to a procurement team than a precise-looking number built on unstated ones.

4. Three products, three planning lines

Планировочная линияПродуктPEA-stage variable
роспускAuCyan™ Цианид натрия NaCN (≥98.3%)Flowsheet fixed? kg/t baseline? permit chain
адсорбцияАктивированный уголь из скорлупы кокосового ореха AuCarb™ для извлечения золота (жесткость ≥99%)Carbon inventory, attrition ≤1.5%, mesh cut
Альтернативный маршрутЗолотовыщелачивающий агент AuLeach™ (GDA) – неопасный.General-cargo option if permits bind; pH and dosage validation

United Chemical supplies all three factory-direct under FOB or CIF terms with batch COA, TDS and MSDS, serving mining operations in more than 77 countries. Free laboratory test samples are available for AuCarb™ and AuLeach™ so ore-specific validation can start during the study phase.

5. Часто задаваемые вопросы

Q1. What was announced on 9 November 2026?
An agreement with Newmont to contribute the Fourmile gold project to the Nevada Gold Mines joint venture.

Q2. What production range does the PEA outline?
Average gold production of 600,000 to 750,000 ounces a year.

Q3. What is the mining rate?
1.5–1.8 million tonnes of ore annually at relatively low mining rates, consistent with a long-life underground operation.

Q4. What is the capital estimate?
US$1.5–1.7 billion at PEA level, with US$360–430 million for the approved phase to mid-2030.

Q5. Has work already started?
Yes. Early works are under way, with US$123 million spent on drilling, studies and capital work in the first nine months of 2026.

Q6. Can a PEA fix the reagent dosage?
No. It gives a production and tonnage range. Dosage still requires ore-specific bottle roll or column testing once the flowsheet is defined.

Q7. Why model the low and high ends separately?
Because 1.5 and 1.8 Mt/y produce materially different reagent tonnages, and averaging hides the procurement risk at the upper bound.

Q8. Which sensitivity matters most?
Recovered grade and metallurgical recovery: both change the treated tonnage needed for a given ounce target.

Q9. Which documents gate the цианид переулок?
Verified import permits, an End-User Certificate and UN 1689 Class 6.1 dangerous-goods documentation, ahead of the factory production slot.

В10. Какие правила Инкотермс применяются?
Применяются условия FOB или CIF.

Q11. Can validation start during the study phase?
Yes — AuCarb™ and AuLeach™ laboratory test samples allow ore-specific work before an FCL order is placed.

Q12. Where are the product specifications published?
Технические страницы AuCyan™, AuCarb™ и AuLeach™, ссылки на которые приведены ниже, содержат сертификаты анализа (COA), технические характеристики (TDS) и паспорта безопасности материалов (MSDS) для каждой партии.

6. Источники и внутренние ссылки

AuCyan™ · Руководство по AuCarb™ · AC50 · AC55 · AC60 · BC1100 · AuLeach™ GDA · Золотой треугольник · Обзор трех продуктов · Часто задаваемые вопросы о химических веществах · Новости отрасли · Свяжитесь с нами

Source note: project figures are drawn from the Barrick Mining update dated 9 November 2026. Reagent figures are United Chemical product data. No demand numbers have been estimated by the publisher.

Build a reagent envelope for your own project

Свяжитесь с нами · WhatsApp +86 173 9270 5576 · info@unitedchemicalcn.com

  • Случайный контент
  • Горячий контент
  • Горячий обзор контента

Вам также может понравиться

Онлайн-консультация по сообщениям

Добавить комментарий:

+8617392705576QR-код WhatsAppСканировать QR-код
Оставьте сообщение для консультации
Спасибо за ваше сообщение, мы свяжемся с вами в ближайшее время!
Отправить
Онлайн-служба поддержки клиентов