A heap-leach ramp, then a CIL plant
Two processing routes on one site means two qualification programmes.
PT Merdeka Gold Resources Tbk (EMAS), majority-owned by PT Merdeka Copper Gold Tbk, recorded US$43 million in EBITDA as gold production surged 69% quarter on quarter, according to Macau Business reporting on the company's release. The Pani Gold Mine in Gorontalo, Indonesia, has mineral resources of 7.0 million ounces and an estimated 15-year mine life. Production is supported by a heap-leach facility with initial capacity of 8 million tonnes a year. The mine began mining in October 2025, achieved first gold in February 2026 and made its first sales in March 2026.
1. Stage one: heap leaching at 8 Mt/y
A heap-leach facility at this scale is a Uhlík-in-column operation in all but name. Gold dissolved in the pad is recovered from pregnant solution on carbon columns, where solution clarity and carbon loading rate dominate. BC1100 je typicky hodnotený stupeň pre stĺp a Vylúhovanie haldy service, selected on K and R values measured with the site's own solution.
2. Stage two: CIL from 2028
The company plans to develop a Uhlíkové lúhovanie (CIL) facility targeted to start in 2028 and scale to 12 million tonnes a year by 2029, with peak production of roughly 500,000–700,000 ounces a year by 2031. A CIL plant is a different reagent environment: carbon sits in agitated tanks, so ball-pan hardness and AARL attrition become as important as activity. The two stages therefore need two carbon specifications and two qualification dossiers, even if the same supplier serves both.
Zlatý trojuholník – tri produkty, jeden dodávateľ
AuCyan™ Kyanid sodný NaCN (≥98.3 %) · AuCarb™ Aktívne uhlie z kokosových škrupín na regeneráciu zlata (tvrdosť ≥99 %) · AuLeach™ Vylúhovacie činidlo na zlato (GDA) – Netoxické
3. Worked scale check
At 8 million tonnes a year through the heap leach, a kyanid demand of 0.15 kg/t implies about 1,200 tonnes a year of NaCN. At the planned 12 Mt/y CIL plant, demand at 0.25 kg/t would be about 3,000 tonnes a year. Even allowing for estimate error, the move from stage one to stage two multiplies reagent volumes by roughly two to three times. Qualifying the second-stage specification during stage one is the only sensible sequence.
Heap leach, 8 Mt/y at 0.15 kg/t: ≈ 1,200 t NaCN/year
CIL, 12 Mt/y at 0.25 kg/t: ≈ 3,000 t NaCN/year
4. Product fit across both stages
AuCyan™ Kyanid sodný NaCN (≥98.3 %) supplies leaching at 18 MT za kontajner. AuCarb™ Aktívne uhlie z kokosových škrupín na získavanie zlata (tvrdosť ≥99 %) is specified differently for column and agitated service at 15 MT za kontajner. AuLeach™ činidlo na vylúhovanie zlata (GDA) – neškodné is evaluated where permitted at 28 MT. All ship with batch COA, TDS a Bezpečnostný list in 25 kg vysokopevnostné laminované PE vrecia pod FOB/CIF pojmy.
3b. Ramp-up is where carbon is lost
A 69% quarter-on-quarter production increase is good news with a hidden cost: ramp-up is the period when consumables are least controlled. Solution grades swing as new pad areas come online, irrigation rates are adjusted, and carbon is moved between columns to balance loading. Each change creates a window in which gold-bearing fines can leave the circuit or carbon can be loaded unevenly before elution. The mitigation is unglamorous but effective — log column inlet and outlet grades daily, sample carbon loading weekly, and keep a running mass balance rather than relying on monthly averages. When the 2028 CIL plant starts, the same discipline transfers directly, with the added variable of tank abrasion. Qualifying both grades during the current heap-leach phase is the only way to avoid a second learning curve in 2028.
3c. Ramp-up is where carbon is lost
A 69% quarter-on-quarter increase is good news with a hidden cost: ramp-up is the period when consumables are least controlled. Solution grades swing as new pad areas come online, irrigation rates are adjusted and carbon is moved between columns to balance loading. Each change creates a window in which gold-bearing fines can leave the circuit or carbon can load unevenly before elution. The mitigation is unglamorous but effective: log column inlet and outlet grades daily, sample carbon loading weekly and keep a running mass balance instead of relying on monthly averages. When the 2028 CIL plant starts, the same discipline transfers directly with the added variable of tank abrasion. Qualifying both grades during the current heap-leach phase is the only way to avoid a second learning curve.
5. Najčastejšie otázky
Q1 — What did EMAS report?
US$43 million EBITDA with gold production up 69% quarter on quarter.
Q2 — What is Pani's resource?
7.0 million ounces of gold with an estimated 15-year mine life.
Q3 — What is planned for 2028?
A CIL facility scaling to 12 Mt/y by 2029.
Q4 — Does carbon spec change between stages?
Yes — column service favours activity; CIL favours hardness and low attrition.
Q5 — What terms are available?
FOB or CIF with batch COA, TDS and MSDS.
Q6 — Can carbon be tested first?
Yes — complimentary AuCarb™ and AuLeach™ samples for laboratory testing.
Qualify stage two during stage one
Send both flowsheets. We return a two-stage carbon and reagent specification with staged delivery terms.
Kontaktujte nás · BC1100 · Prehľad Zlatého trojuholníka · Industry News
WhatsApp +86 173 9270 5576 · info@unitedchemicalcn.com
Source: Macau Business, reporting on PT Merdeka Gold Resources Tbk (EMAS) results, November 2026.
- Náhodný obsah
- Horúci obsah
- Horúci obsah recenzií
- CERTIFIKÁT SYSTÉMU ENVIRONMENTÁLNEHO MANAŽÉRSTVA
- Kyselina šťaveľová pre ťažbu 99.6%
- Rozšírená výbušnina AN
- Kovový sodík, ≥ 99.7 %
- Hydrogénsiričitan sodný 99% vysokokvalitné továrenské dodávky
- 1Zľavnený kyanid sodný (CAS: 143-33-9) na ťažbu – vysoká kvalita a konkurencieschopné ceny
- 2Kyanid sodný 98.3% CAS 143-33-9 NaCN, činidlo na úpravu zlata, nevyhnutné pre banský chemický priemysel
- 3Nové čínske nariadenia o vývoze kyanidu sodného a usmernenia pre medzinárodných kupujúcich
- 4Kyanid sodný (CAS: 143-33-9) Certifikát koncového používateľa (čínska a anglická verzia)
- 5Medzinárodný kódex riadenia kyanidu(kyanid sodný) - Štandardy akceptácie zlatých baní
- 6Čínska továreň kyselina sírová 98%
- 7Bezvodá kyselina šťaveľová 99.6% priemyselnej kvality
- 1Kyanid sodný 98.3% CAS 143-33-9 NaCN, činidlo na úpravu zlata, nevyhnutné pre banský chemický priemysel
- 2Vysoká čistota · Stabilný výkon · Vyššia výťažnosť — kyanid sodný pre moderné lúhovanie zlata
- 3United ChemicalVýskumný tím preukazuje autoritu prostredníctvom poznatkov založených na dátach
- 4AuCyan™ Vysokovýkonný kyanid sodný | Čistota 98.3 % pre globálnu ťažbu zlata
- 5Digitálna elektronická rozbuška(čas oneskorenia 0~ 16000 ms)
- 6Vysokopevnostná, vysoko presná rázová rozbuška
- 7priemysel Elektrická rozbuška










Online konzultácia správ
Pridať komentár: