A heap-leach ramp, then a CIL plant
Two processing routes on one site means two qualification programmes.
PT Merdeka Gold Resources Tbk (EMAS), majority-owned by PT Merdeka Copper Gold Tbk, recorded US$43 million in EBITDA as gold production surged 69% quarter on quarter, according to Macau Business reporting on the company's release. The Pani Gold Mine in Gorontalo, Indonesia, has mineral resources of 7.0 million ounces and an estimated 15-year mine life. Production is supported by a heap-leach facility with initial capacity of 8 million tonnes a year. The mine began mining in October 2025, achieved first gold in February 2026 and made its first sales in March 2026.
1. Stage one: heap leaching at 8 Mt/y
A heap-leach facility at this scale is a Carbonio-in-column operation in all but name. Gold dissolved in the pad is recovered from pregnant solution on carbon columns, where solution clarity and carbon loading rate dominate. BC1100 è il grado tipicamente valutato per la colonna e Lisciviazione del cumulo service, selected on K and R values measured with the site's own solution.
2. Stage two: CIL from 2028
The company plans to develop a Carbonio in lisciviazione (CIL) facility targeted to start in 2028 and scale to 12 million tonnes a year by 2029, with peak production of roughly 500,000–700,000 ounces a year by 2031. A CIL plant is a different reagent environment: carbon sits in agitated tanks, so ball-pan hardness and AARL attrition become as important as activity. The two stages therefore need two carbon specifications and two qualification dossiers, even if the same supplier serves both.
Il Triangolo d'Oro: tre prodotti, un fornitore
AuCyan™ Cianuro di sodio NaCN (≥98.3%) · AuCarb™ Recupero dell'oro Carbone attivo da guscio di cocco (durezza ≥99%) · AuLeach™ Agente di lisciviazione dell'oro (GDA) – Non pericoloso
3. Worked scale check
At 8 million tonnes a year through the heap leach, a cianuro demand of 0.15 kg/t implies about 1,200 tonnes a year of NaCN. At the planned 12 Mt/y CIL plant, demand at 0.25 kg/t would be about 3,000 tonnes a year. Even allowing for estimate error, the move from stage one to stage two multiplies reagent volumes by roughly two to three times. Qualifying the second-stage specification during stage one is the only sensible sequence.
Heap leach, 8 Mt/y at 0.15 kg/t: ≈ 1,200 t NaCN/year
CIL, 12 Mt/y at 0.25 kg/t: ≈ 3,000 t NaCN/year
4. Product fit across both stages
AuCyan™ Cianuro di sodio NaCN (≥98.3%) supplies leaching at 18 MT per contenitore. AuCarb™ Gold Recovery Carbone attivo da guscio di cocco (durezza ≥99%) is specified differently for column and agitated service at 15 MT per contenitore. AuLeach™ Agente di lisciviazione dell'oro (GDA) – Non pericoloso viene valutato ove consentito a 28 MTTutti i lotti vengono spediti insieme COA, TDS and MSDS in Sacchi in PE laminato per carichi pesanti da 25 kg per FOB / CIF termini.
3b. Ramp-up is where carbon is lost
A 69% quarter-on-quarter production increase is good news with a hidden cost: ramp-up is the period when consumables are least controlled. Solution grades swing as new pad areas come online, irrigation rates are adjusted, and carbon is moved between columns to balance loading. Each change creates a window in which gold-bearing fines can leave the circuit or carbon can be loaded unevenly before elution. The mitigation is unglamorous but effective — log column inlet and outlet grades daily, sample carbon loading weekly, and keep a running mass balance rather than relying on monthly averages. When the 2028 CIL plant starts, the same discipline transfers directly, with the added variable of tank abrasion. Qualifying both grades during the current heap-leach phase is the only way to avoid a second learning curve in 2028.
3c. Ramp-up is where carbon is lost
A 69% quarter-on-quarter increase is good news with a hidden cost: ramp-up is the period when consumables are least controlled. Solution grades swing as new pad areas come online, irrigation rates are adjusted and carbon is moved between columns to balance loading. Each change creates a window in which gold-bearing fines can leave the circuit or carbon can load unevenly before elution. The mitigation is unglamorous but effective: log column inlet and outlet grades daily, sample carbon loading weekly and keep a running mass balance instead of relying on monthly averages. When the 2028 CIL plant starts, the same discipline transfers directly with the added variable of tank abrasion. Qualifying both grades during the current heap-leach phase is the only way to avoid a second learning curve.
5. FAQ
Q1 — What did EMAS report?
US$43 million EBITDA with gold production up 69% quarter on quarter.
Q2 — What is Pani's resource?
7.0 million ounces of gold with an estimated 15-year mine life.
Q3 — What is planned for 2028?
A CIL facility scaling to 12 Mt/y by 2029.
Q4 — Does carbon spec change between stages?
Yes — column service favours activity; CIL favours hardness and low attrition.
D5 — Quali sono le condizioni disponibili?
FOB o CIF con certificato di analisi (COA), scheda tecnica (TDS) e scheda di sicurezza (MSDS) del lotto.
Q6 — Can carbon be tested first?
Yes — complimentary AuCarb™ and AuLeach™ samples for laboratory testing.
Qualify stage two during stage one
Send both flowsheets. We return a two-stage carbon and reagent specification with staged delivery terms.
Contattaci · BC1100 · Panoramica del Triangolo d'Oro · Industry News
WhatsApp +86 173 9270 5576 info@unitedchemicalcn.com
Source: Macau Business, reporting on PT Merdeka Gold Resources Tbk (EMAS) results, November 2026.
- Contenuto casuale
- Contenuti caldi
- Contenuto di recensioni hot
- CERTIFICATO DEL SISTEMA DI GESTIONE AMBIENTALE
- Acido ossalico per l'industria mineraria 99.6%
- Esplosivo AN espanso
- Sodio metallico, ≥99.7%
- Bisolfito di sodio 99% fornitura di fabbrica di alta qualità
- 1Cianuro di sodio scontato (CAS: 143-33-9) per l'attività mineraria - Alta qualità e prezzi competitivi
- 2Cianuro di sodio 98.3% CAS 143-33-9 NaCN agente di rivestimento dell'oro essenziale per le industrie chimiche minerarie
- 3Nuove normative cinesi sulle esportazioni di cianuro di sodio e linee guida per gli acquirenti internazionali
- 4Cianuro di sodio (CAS: 143-33-9) Certificato per l'utente finale (versione cinese e inglese)
- 5Codice internazionale di gestione del cianuro (cianuro di sodio) - Standard di accettazione delle miniere d'oro
- 6Fabbrica cinese Acido solforico 98%
- 7Acido ossalico anidro 99.6% grado industriale
- 1Cianuro di sodio 98.3% CAS 143-33-9 NaCN agente di rivestimento dell'oro essenziale per le industrie chimiche minerarie
- 2Elevata purezza · Prestazioni stabili · Recupero più elevato: cianuro di sodio per la moderna lisciviazione dell'oro
- 3United ChemicalIl team di ricerca di dimostra autorevolezza attraverso approfondimenti basati sui dati
- 4Cianuro di sodio ad alte prestazioni AuCyan™ | Purezza del 98.3% per l'estrazione globale dell'oro
- 5Detonatore elettronico digitale (tempo di ritardo 0~ 16000ms)
- 6Detonatore a tubo d'urto ad alta resistenza e alta precisione
- 7industria Detonatore elettrico










Consultazione messaggi online
Aggiungi un commento: