UNITED CHEMICAL · VALDKONNA UUDISED · 27. NOVEMBER 2026
Enchi moves from study to permitting
A mining lease application is a reagent supplier's earliest reliable signal.
Newcore Gold has submitted a mining lease application for its Enchi Gold Project in southwestern Ghana, according to Graphic Online and NewsThemeGH, reporting on the company's 19 November 2026 announcement. The application covers 53.37 km² of the project's 248 km² concession, with regulatory review expected to conclude by mid-2027. The proposed US$351 million project is designed to produce an average 104,000 ounces of gold a year over a 9.3-year mine life.
1. Why a lease filing matters more than a resource update
A resource estimate tells you how much gold might be there. A lease application tells you a developer is spending money to get permission to build. The Enchi filing follows a pre-feasibility study started in February 2026, environmental baseline work conducted since 2015 and additional studies in 2023 through 2026. Independent consultants concluded there were no existing water, soil, noise or air-quality issues. That is the kind of sequence that turns a project from speculative into plan-able.
2. The 104,000 oz/y question
Average annual production of 104,000 ounces over 9.3 years implies roughly 967,000 ounces of life-of-mine output. At a typical CIP or CIL circuit, Süsinik make-up at 0.05 kg per tonne of ore and a tsüaniid demand of 0.25 kg/t, the consumables envelope is material long before the first pour. The exact figures depend on the flowsheet, which has not been finalised at the lease stage. What is certain is that qualification — hardness and attrition for carbon, dissolution profile for the leach reagent — takes months and must start before construction finishes.
Reported plan: 104,000 oz/y over 9.3 years
Implied life-of-mine: ≈ 967,000 untsi
Kuldne kolmnurk – kolm toodet, üks tarnija
AuCyan™ naatriumtsüaniid NaCN (≥98.3%) · AuCarb™ kookospähkli koore aktiivsüsi (kõvadus ≥99%) · AuLeach™ kulla leostusaine (GDA) – mitteohtlik
3. The permitting calendar as a supply calendar
The lease review is expected to conclude by mid-2027, with the Ghanaian government targeting issuance in the first half of 2027. An environmental permit from the Ghana Environmental Protection Authority follows. For a supplier, this sequence defines three gates. Gate one is laboratory qualification against Enchi ore. Gate two is a pilot container once the flowsheet is fixed. Gate three is the first commercial 1×20' FCL under FOB / CIF tingimused partiiga COA, TDS ja MSDS. Trying to compress these gates is how projects arrive at commissioning without qualified reagents.
4. Product fit at a greenfield Ghanaian project
AuCyan™ naatriumtsüaniid NaCN (≥98.3%) moves on a licensed-import timetable at 18 MT per container, with import licence and End-Use Certificate arranged before shipment. AuCarb™ kuldse taastamise kookospähkli koorest aktiivsüsi (kõvadus ≥99%) provides adsorption inventory at 15 MT. AuLeach™ kulla leostusaine (GDA) – ohtlik is evaluated where permitted, at 28 MT, only after bottle-roll comparison. All three ship in 25 kg vastupidavad lamineeritud PE-kotid.
3b. Heap leach or CIL — the decision ahead
At the mining-lease stage the flowsheet is not final, and the choice between Kuhja leostumine ja Leostussüsi (CIL) will define the reagent bill for the life of the project. Heap leaching suits lower-grade oxide material with favourable permeability, using Süsinik kolonnis (CIC) recovery from pregnant solution. CIL suits higher-grade or clay-bearing ore where tank contact gives better recovery. The two routes need different carbon grades and different qualification tests: column service rewards activity and loading rate, while agitated CIL rewards ball-pan hardness and low AARL attrition. A supplier who can model both from the same ore sample gives the project team a genuine comparison rather than a single quotation. This is the value of starting qualification at the permitting stage instead of waiting for the plant design to be frozen.
5. KKK-d
Q1 — What was filed?
A mining lease application covering 53.37 km² of the Enchi concession.
Q2 — What is the planned output?
An average 104,000 oz/y over a 9.3-year mine life, per company reporting.
Q3 — When could the lease be granted?
The government has indicated a target of the first half of 2027.
Q4 — Why qualify reagents before construction ends?
Because hardness, attrition and dissolution qualification take months.
Q5 — What terms are available?
FOB või CIF koos partii autentsussertifikaadi, TDS-i ja MSDS-iga.
Q6 — Can samples be tested first?
Yes — complimentary AuCarb™ and AuLeach™ samples for independent laboratory testing.
Start qualification before the lease is granted
Send your flowsheet and ore data. We build a qualification-to-delivery schedule aligned to your permitting calendar.
Võta meiega ühendust · Kuldse kolmnurga ülevaade · Kemikaalide KKK · Tööstusuudised
WhatsAppi +86 173 9270 5576 · info@unitedchemicalcn.com
Sources: Graphic Online and NewsThemeGH, reporting on Newcore Gold's 19 November 2026 announcement.
- Juhuslik sisu
- Kuum sisu
- Kuum arvustuste sisu
- အလုပ် ခေါင်းစဉ် : ပြောင်းသာလဲသာ ရှိ ရှိ ဖောက်သည် နှင့် ထောက်ပံ့ ပေး သူ ဆက်ဆ ကျွမ်းကျင် သူMyanmar
- IPETC 95%Metallsulfiidmineraalide koguja Z-200
- Oksaalhape kaevandamiseks 99.6%
- Löögitoru detonaator
- Naatrium-alfa-olefiinsulfonaat (AOS)
- 1Soodushinnaga naatriumtsüaniid (CAS: 143-33-9) kaevandamiseks – kõrge kvaliteet ja konkurentsivõimeline hind
- 2Naatriumtsüaniid 98.3% CAS 143-33-9 NaCN kulla sidumisaine, mis on oluline kaevanduskeemiatööstuses
- 3Hiina uued eeskirjad naatriumtsüaniidi ekspordi kohta ja juhised rahvusvahelistele ostjatele
- 4Naatriumtsüaniid (CAS: 143-33-9) Lõppkasutaja sertifikaat (hiina- ja ingliskeelne versioon)
- 5Rahvusvaheline tsüaniid (naatriumtsüaniid) halduskoodeks – kullakaevanduse aktsepteerimise standardid
- 6Hiina tehas 98% väävelhape
- 7Veevaba oksaalhape 99.6% tööstuslik kvaliteet
- 1Naatriumtsüaniid 98.3% CAS 143-33-9 NaCN kulla sidumisaine, mis on oluline kaevanduskeemiatööstuses
- 2Kõrge puhtusaste · Stabiilne jõudlus · Suurem saagis — naatriumtsüaniid tänapäevaseks kulla leostamiseks
- 3United ChemicalUurimisrühm demonstreerib autoriteeti andmepõhiste teadmiste kaudu
- 4AuCyan™ kõrgjõudlusega naatriumtsüaniid | 98.3% puhtusaste ülemaailmseks kullakaevandamiseks
- 5Digitaalne elektrooniline detonaator (viivitusaeg 0 ~ 16000 ms)
- 6Kõrge tugevusega ülitäpne põrutustoru detonaator
- 7tööstus elektridetonaator










Online sõnumite konsultatsioon
Lisa kommentaar: