UNITED CHEMICAL · חדשות התעשייה · 27 בנובמבר 2026
A heap-leach ramp, then a CIL plant
Two processing routes on one site means two qualification programmes.
PT Merdeka Gold Resources Tbk (EMAS), majority-owned by PT Merdeka Copper Gold Tbk, recorded US$43 million in EBITDA as gold production surged 69% quarter on quarter, according to Macau Business reporting on the company's release. The Pani Gold Mine in Gorontalo, Indonesia, has mineral resources of 7.0 million ounces and an estimated 15-year mine life. Production is supported by a heap-leach facility with initial capacity of 8 million tonnes a year. The mine began mining in October 2025, achieved first gold in February 2026 and made its first sales in March 2026.
1. Stage one: heap leaching at 8 Mt/y
A heap-leach facility at this scale is a פחמן-in-column operation in all but name. Gold dissolved in the pad is recovered from pregnant solution on carbon columns, where solution clarity and carbon loading rate dominate. BC1100 הוא הציון המוערך בדרך כלל עבור עמודה ו שטיפת ערימה service, selected on K and R values measured with the site's own solution.
2. Stage two: CIL from 2028
The company plans to develop a פחמן בדליפה (CIL) facility targeted to start in 2028 and scale to 12 million tonnes a year by 2029, with peak production of roughly 500,000–700,000 ounces a year by 2031. A CIL plant is a different reagent environment: carbon sits in agitated tanks, so ball-pan hardness and AARL attrition become as important as activity. The two stages therefore need two carbon specifications and two qualification dossiers, even if the same supplier serves both.
משולש הזהב - שלושה מוצרים, ספק אחד
AuCyan™ נתרן ציאניד NaCN (≥98.3%) · פחם פעיל לקליפת קוקוס משחזור זהב AuCarb™ (קשיות ≥99%) · סוכן שטיפה של זהב AuLeach™ (GDA) – לא מסוכן
3. Worked scale check
At 8 million tonnes a year through the heap leach, a ציאניד demand of 0.15 kg/t implies about 1,200 tonnes a year of NaCN. At the planned 12 Mt/y CIL plant, demand at 0.25 kg/t would be about 3,000 tonnes a year. Even allowing for estimate error, the move from stage one to stage two multiplies reagent volumes by roughly two to three times. Qualifying the second-stage specification during stage one is the only sensible sequence.
Heap leach, 8 Mt/y at 0.15 kg/t: ≈ 1,200 t NaCN/year
CIL, 12 Mt/y at 0.25 kg/t: ≈ 3,000 t NaCN/year
4. Product fit across both stages
AuCyan™ נתרן ציאניד NaCN (≥98.3%) supplies leaching at 18 MT לכל מכולה. פחם פעיל AuCarb™ Gold Recovery קליפת קוקוס (קשיות ≥99%) is specified differently for column and agitated service at 15 MT לכל מכולה. סוכן שטיפה AuLeach™ Gold (GDA) – לא מסוכן מוערך היכן שמותר ב 28 MTכל הספינה נשלחת עם אצווה תעודת מקוריות, TDS ו MSDS in שקיות PE למינציה חזקות במשקל 25 ק"ג תחת FOB / CIF מונחים.
3b. Ramp-up is where carbon is lost
A 69% quarter-on-quarter production increase is good news with a hidden cost: ramp-up is the period when consumables are least controlled. Solution grades swing as new pad areas come online, irrigation rates are adjusted, and carbon is moved between columns to balance loading. Each change creates a window in which gold-bearing fines can leave the circuit or carbon can be loaded unevenly before elution. The mitigation is unglamorous but effective — log column inlet and outlet grades daily, sample carbon loading weekly, and keep a running mass balance rather than relying on monthly averages. When the 2028 CIL plant starts, the same discipline transfers directly, with the added variable of tank abrasion. Qualifying both grades during the current heap-leach phase is the only way to avoid a second learning curve in 2028.
3c. Ramp-up is where carbon is lost
A 69% quarter-on-quarter increase is good news with a hidden cost: ramp-up is the period when consumables are least controlled. Solution grades swing as new pad areas come online, irrigation rates are adjusted and carbon is moved between columns to balance loading. Each change creates a window in which gold-bearing fines can leave the circuit or carbon can load unevenly before elution. The mitigation is unglamorous but effective: log column inlet and outlet grades daily, sample carbon loading weekly and keep a running mass balance instead of relying on monthly averages. When the 2028 CIL plant starts, the same discipline transfers directly with the added variable of tank abrasion. Qualifying both grades during the current heap-leach phase is the only way to avoid a second learning curve.
5. שאלות נפוצות
Q1 — What did EMAS report?
US$43 million EBITDA with gold production up 69% quarter on quarter.
Q2 — What is Pani's resource?
7.0 million ounces of gold with an estimated 15-year mine life.
Q3 — What is planned for 2028?
A CIL facility scaling to 12 Mt/y by 2029.
Q4 — Does carbon spec change between stages?
Yes — column service favours activity; CIL favours hardness and low attrition.
שאלה 5 - אילו תנאים זמינים?
FOB או CIF עם תעודת זהות של אצווה, TDS ו-MSDS.
Q6 — Can carbon be tested first?
Yes — complimentary AuCarb™ and AuLeach™ samples for laboratory testing.
Qualify stage two during stage one
Send both flowsheets. We return a two-stage carbon and reagent specification with staged delivery terms.
צרו איתנו קשר · BC1100 · סקירה כללית של משולש הזהב · חדשות התעשייה
וואטסאפ +86 173 9270 5576 info@unitedchemicalcn.com
Source: Macau Business, reporting on PT Merdeka Gold Resources Tbk (EMAS) results, November 2026.
- תוכן אקראי
- תוכן חם
- תוכן ביקורת חם
- תעודת מערכת ניהול סביבה
- חומצה אוקסלית לכרייה 99.6%
- חומר נפץ מורחב
- נתרן מתכת, ≥99.7%
- נתרן ביסולפיט 99% אספקת מפעל באיכות גבוהה
- 1נתרן ציאניד מוזל (CAS: 143-33-9) לכרייה - איכות גבוהה ותמחור תחרותי
- 2נתרן ציאניד 98.3% CAS 143-33-9 NaCN חומר הלבשת זהב חיוני לתעשיות כימיות כרייה
- 3התקנות החדשות של סין על יצוא נתרן ציאניד והדרכה לקונים בינלאומיים
- 4נתרן ציאניד (CAS: 143-33-9) תעודת משתמש קצה (גרסה סינית ואנגלית)
- 5ציאניד בינלאומי (נתרן ציאניד) קוד ניהול - תקני קבלת מכרה הזהב
- 6חומצה גופרתית במפעל בסין 98%
- 7חומצה אוקסלית נטולת מים 99.6% כיתה תעשייתית
- 1נתרן ציאניד 98.3% CAS 143-33-9 NaCN חומר הלבשת זהב חיוני לתעשיות כימיות כרייה
- 2טוהר גבוה · ביצועים יציבים · התאוששות גבוהה יותר - נתרן ציאניד לשטיפת זהב מודרנית
- 3United Chemicalצוות המחקר של מפגין סמכות באמצעות תובנות מבוססות נתונים
- 4ציאניד נתרן בעל ביצועים גבוהים AuCyan™ | טוהר 98.3% לכריית זהב עולמית
- 5נפץ אלקטרוני דיגיטלי (זמן השהייה 0 ~ 16000ms)
- 6מפיץ צינור הלם בעל חוזק גבוה, דיוק גבוה
- 7נפץ חשמלי בתעשייה










יעוץ מסרים מקוון
הוסף תגובה: