Te pikinga o Geita ki te 600,000 auneke/tau i te tau 2030: He Tātaitanga Mahi mō te Whakamahinga Waro me te Tauhohenga i runga i te Whanuitanga o te Papa Parauri

US$480–580 million on an existing footprint — a step-by-step method for converting an ounce increment into ore tonnage, reagent demand and container counts.

Six by twelve mesh coconut shell activated carbon granules for gold adsorption circuits

Industry News · 5 November 2026

Geita to 600,000 oz/y by 2030: A Worked Calculation of Carbon and Reagent Consumption

The expansion raises throughput on an existing footprint. That makes waro circulation and reagent consistency the variables that move.

Whakautu Tere

AngloGold Ashanti has allocated US$480–580 million to expand the Geita gold mine in Tanzania, targeting annual production of about 600,000 ounces by 2030 against 492,000 ounces in 2025. It is the largest single item in the company's US$750–900 million brownfield programme announced on 5 November 2026. Q3 2026 output was 120,000 ounces, 4% lower year on year, as mined grades declined. Because the circuit already exists, the planning task is to convert an ounce increment into ore tonnage, reagent kilograms and container counts — using the plant's own measured inputs.

Nga Takea Matua

  • Existing footprint, higher throughput. The expansion does not replace the leaching and adsorption circuits; it loads them more heavily.
  • Grade decline is the multiplier. Q3 2026 output fell 4% year on year as mined grades declined, so more tonnes are needed per ounce.
  • Carbon circulation rises with throughput. Higher screening duty makes attrition ≤1.5% and a 6×12 mesh cut directly relevant to recovery.
  • Calculate with your own inputs. Grade, recovery, kg/t consumption and carbon make-up must come from plant logs or a test programme — not from a headline figure.
  • MOQs set the container rhythm: 15 MT for AuCarb™, 18 MT for AuCyan™, 28 MT for AuLeach™ per 1×20' FCL.
  • Documentation precedes production. hea konutai Cyanide is used, permits and an End-User Certificate gate the factory slot.
Dated fact table · announced 5 November 2026
Te nama takeDisclosed figure
Allocation to GeitaUS $480–580 miriona
Target production~600,000 oz/y by 2030
2025 turanga492,000 oz
Q3 2026 output120,000 oz, 4% lower year on year
Programme contextLargest item in a US$750–900m brownfield programme

Source: company Q3 2026 update and expansion announcement, 5 November 2026. The calculation below is a method; all inputs are plant-specific and are not estimated by the publisher.

1. Why this is a consumables question

A brownfield expansion inherits the flowsheet. Tanks, agitation, screens, pumps, carbon advance systems and the water balance are already designed and commissioned. The additional ounces have to pass through that installed equipment, typically by raising throughput, improving grade control or extending operating hours. Reagent demand therefore scales with treated tonnage rather than with the capital budget.

There is a second effect. When mined grade declines, the same ounce target requires more ore. Geita's Q3 2026 output of 120,000 oz, down 4% year on year as grades declined, is exactly that pattern. It means reagent consumption per ounce rises even if consumption per tonne of ore is unchanged — a distinction that matters when the margin is under pressure from a higher AISC.

2. Four difficulties in a brownfield consumables plan

2.1 Grade uncertainty across the ramp

A single grade assumption hides the two ends of the plan. Model at least a base and a lower-grade case, because the lower-grade case drives the highest tonnage and reagent demand.

2.2 Carbon inventory and screening duty

More throughput means more carbon movement and more screening cycles. Fines generated above the ≤1.5% attrition design limit leave the circuit loaded with gold, so the loss is a recovery gap rather than a visible consumable expense.

2.3 Water balance and reagent build-up

Recirculated process water concentrates dissolved salts and residual reagent over a longer campaign. Without routine measurement, apparent consumption drifts and operators compensate by over-dosing.

2.4 Multi-site documentation

hea konutai cyanide is used, the UN 1689 Class 6.1 permit chain and the End-User Certificate must be closed before production is scheduled, and dangerous-goods booking has to be sequenced to the ramp, not to the nameplate date.

3. Tutorial: a seven-step worked calculation

The steps below are deliberately written as formulas. Insert your own measured inputs; do not substitute published headline numbers for plant data.

  1. Define the ounce increment. ΔOz = target annual ounces − base-year ounces. Use the disclosed 600,000 oz/y target and 492,000 oz 2025 base as the boundary, then state the ramp year you are solving for.
  2. Convert ounces to treated ore. ΔT = ΔOz ÷ (recovered grade × metallurgical recovery). State both grade and recovery as measured plant values, and run a lower-grade case.
  3. Apply leaching reagent consumption. Reagent kg = ΔT × measured kg/t from plant logs or a bottle roll programme. Keep the figure tied to a specific ore blend.
  4. Apply carbon make-up. Carbon kg = ΔT × measured carbon make-up rate (kg/t), cross-checked against the ≤1.5% attrition design figure and the plant's carbon inventory survey.
  5. Convert to FCL counts. Divide each reagent tonnage by its MOQ — 18 MT for AuCyan™ Sodium Cyanide NaCN (≥98.3%), 15 MT for AuCarb™ Gold Recovery Coconut Shell Activated Carbon (≥99% Hardness), 28 MT for AuLeach™ Gold Leaching Agent (GDA) – Non-Hazardous — and round up to whole containers.
  6. Build the delivery calendar against the ramp curve, then place the documentation gate (permit, EUC, dangerous-goods booking) ahead of the first production slot.
  7. Close the measurement loop. Log consumption, pH, free tina or residual reagent, dissolved gold and recovery against each batch COA; update step 3 and step 4 inputs as the ore blend changes.

A useful sanity check: if step 2 tonnage rises but step 5 container count does not, the MOQ rounding is hiding a step change. Always show the unrounded figure next to the container count.

4. Ripanga rapurongoā

WhakaatuTe take peaTirohanga tuatahi
Consumption per ounce risingGrade decline, more tonnes per ounceRecovered grade, recovery, ΔT calculation
Carbon make-up above designHigher screening duty, attrition above ≤1.5%Fines in tails, screen aperture, circulation rate
Apparent consumption driftingResidual reagent in recirculated waterSolution balance, water quality, titration routine
Gold in final-stage solutionAdsorption rate-limited at higher throughputCarbon concentration, residence time, R value
Shipment late against rampDocumentation gate not sequencedPermit status, EUC, dangerous-goods booking

5. Three products in the expanded circuit

wāhangaHuaExpansion-sensitive variable
TuhingaAuCyan™ Konutai Cyanide NaCN (≥98.3%)kg/t at higher tonnage, free-cyanide control
WhakapohotangaWaro Whakahohe Anga Kokonati AuCarb™ Whakaora Koura (≥99% Mārō)Attrition ≤1.5%, 6×12 mesh, K ≥26 kg/t / R ≥50% on AC50
huarahi kēAuLeach™ Kaihoko Whakarewa Koura (GDA) – Kāore he MōreareaGeneral-cargo scheduling, pH 10.5–12 validation

Deliveries to East African operations are quoted FOB from major Chinese ports or CIF to the nominated destination, factory-direct at 15 / 18 / 28 MT minimum order quantities, with batch COA, TDS and MSDS. Free laboratory test samples are available for AuCarb™ and AuLeach™.

6. Nga Rapu Uiui

Q1. What is Geita's expansion allocation?
US$480–580 million, the largest single item in the US$750–900 million brownfield programme announced on 5 November 2026.

Q2. What production level is targeted?
About 600,000 ounces a year by 2030, against 492,000 ounces in 2025.

Q3. What happened to Q3 2026 output?
It was 120,000 ounces, 4% lower year on year, as mined grades declined.

Q4. Why is this a consumables question rather than a design one?
The leaching and adsorption circuits already exist; the extra ounces pass through installed equipment, so demand scales with treated tonnage.

Q5. How does grade decline change reagent demand?
More ore must be treated per ounce recovered, raising consumption per ounce even when consumption per tonne is unchanged.

Q6. How do you convert ounces into ore tonnage?
ΔT = ΔOz ÷ (recovered grade × metallurgical recovery), using measured plant values and a lower-grade sensitivity case.

Q7. Which carbon parameters become more important at higher throughput?
Attrition ≤1.5%, a 6×12 mesh cut, platelet ≤5.0% and the K ≥26 kg/t / R ≥50% pair on AC50.

Q8. What are the minimum order quantities?
15 MT for AuCarb™, 18 MT for AuCyan™, 28 MT for AuLeach™, each per 1×20' FCL.

P9. Ko ēhea ngā Incoterms e pā ana?
Ka pā ngā tikanga FOB, CIF rānei.

Q10. Which documents gate the cyanide lane?
Verified import permits, an End-User Certificate and UN 1689 Class 6.1 dangerous-goods documentation ahead of the production slot.

Q11. Can the calculation use published project figures as inputs?
No. Grade, recovery, kg/t consumption and carbon make-up must come from plant logs or a test programme; the published figures only set the boundary.

P12. Kei hea e taea ai te arotake i ngā whakatakotoranga?
Kei ngā whārangi hangarau AuCyan™, AuCarb™ me AuLeach™ e hono ana i raro nei, me te COA puranga, TDS me te MSDS mō ia rota.

7. Ngā pūtake me ngā hononga ā-roto

Aratohu AuCarb™ · AC50 · AC55 · AC60 · BC1100 · AuCyan™ · AuLeach™ GDA · Golden Triangle · Tirohanga whānui mō ngā hua e toru · Nga patai matū · ahumahi News · Whakapā mai

Source note: project figures are drawn from the company Q3 2026 update and expansion announcement dated 5 November 2026. Reagent figures are United Chemical product data. The calculation is a method using plant-supplied inputs; no demand result has been estimated by the publisher.

Run this calculation with your own plant data

Whakapā mai · WhatsApp +86 173 9270 5576 · info@unitedchemicalcn.com

kia rite hoki koe

Te whakawhitiwhiti korero i runga ipurangi

Tāpiri kōrero:

+ 8617392705576Waehere QR WhatsAppKarapa QR tohu
Waiho he korero mo te korerorero
Nga mihi mo to korero, ka whakapa atu matou ki a koe apopo!
Tuku
Ratonga Kaihoko Ipurangi