When AISC Hits US$1,930, Reagent Efficiency Becomes Strategy

A three-product framework for turning cyanide dissolution, carbon hardness and leach chemistry into cost per ounce.

The three United Chemical gold recovery products arranged as one supply line

UNITED CHEMICAL · COMPANY NOTE · 27 NOVEMBER 2026

Efficiency is the lever you still control

Gold price and grade are given. Reagent performance is not.

The World Gold Council reported all-in sustaining costs of US$1,930 an ounce in Q2 2026, up 22% year on year — the steepest annual rise since early 2013 — alongside record third-quarter mine production of 1,070.9 tonnes. This week's news adds context: a US$351 million gold project in Ghana filed for its mining lease, Gold Fields projected US$7.5 billion at Tarkwa, Kazakhstan began building a sorption leach plant, Indonesia's Pani mine lifted output 69% and Türkiye restarted stockpiles at Çöpler. Five very different projects share one problem: cost per recovered ounce.

1. The three levers inside reagent efficiency

Dissolution — a briquette with a defined release profile holds the free-cyanide setpoint without over-dosing. A one-tank lag at 3,000 t/day can waste around 33 tonnes of NaCN a year.

Adsorption — Carbon at ball-pan hardness ≥99% and AARL attrition ≤1.5% keeps gold out of the fines. Moving from 3.0% to 1.5% attrition saves about 2.1 tonnes of make-up carbon a year at 2,000 t/day.

Route choice — a non-cyanide alternative can be evaluated where permitting or ore chemistry makes cyanidation uneconomic, but the decision must be made on bottle-roll data.

2. One portfolio, three qualification anchors

ProductEfficiency anchorMOQ
AuCyan™ Sodium Cyanide NaCN (≥98.3%)Dissolution profile, licensed import1×20' FCL ≈ 18 MT
AuCarb™ Gold Recovery Coconut Shell Activated Carbon (≥99% Hardness)Ball-pan hardness, AARL attrition, K/R1×20' FCL ≈ 15 MT
AuLeach™ Gold Leaching Agent (GDA) – Non-HazardouspH window, split dosage1×20' FCL ≈ 28 MT

3. Worked margin arithmetic

At AISC of US$1,930/oz and a gold price of US$3,550/oz, the gross margin per ounce is about US$1,620. A one-percentage-point recovery improvement on a 100,000 oz/y operation adds roughly 1,000 ounces, or about US$1.62 million of gross margin at that spread. Even a small efficiency gain in dissolution or adsorption can exceed the entire annual reagent bill. This is the arithmetic that turns reagent selection into a strategic decision when costs are at a record.

Gross margin per ounce: ≈ US$1,620

+1 pt recovery: ≈ US$1.62 million/year

4. What "same specification" means

It means a batch COA, TDS and MSDS with every shipment; carbon in 25 kg heavy-duty laminated PE bags with hardness and activity documented; Sodium Cyanide moving on a licensed-import timetable with End-Use Certificate; and all commercial terms FOB/CIF. It means the process vocabulary is fixed — Carbon-in-Pulp (CIP), Carbon-in-Leach (CIL), Carbon-in-Column (CIC), Heap leaching and Vat leaching — so a plant in Ghana and a plant in Kazakhstan are specifying the same thing.

5. Staged qualification protocol

Four gates keep a multi-site programme honest. Gate one is laboratory comparison on the site's own ore. Gate two is specification lock: K and R values, hardness and attrition for carbon; dissolution profile and dosage envelope for the leach system. Gate three is the pilot container, received against a batch COA and checked against the locked specification. Gate four is the repeat order, released only when pilot-container performance matches the laboratory result. Skipping a gate does not save time — it moves the failure to a more expensive point.

4b. What a multi-site dossier contains

A dossier that survives an audit contains more than a product sheet. It holds the specification, the batch COA, TDS and MSDS, the test method used to derive each number, and a record of batch-to-batch variance over time. For a company running a CIL start-up in Ghana, a sorption plant in Kazakhstan and a two-stage heap/CIL operation in Indonesia, the dossier is what allows the same product name to mean the same thing at three sites. It also makes cost-per-ounce comparisons defensible: a metallurgist cannot attribute a recovery change to reagent quality if the incoming specification was never documented. The alternative — shipping on a sales claim — fails at the first audit and leaves the operating team without a baseline for improvement.

6. FAQ

Q1 — What is AISC and why does it matter here?

All-in sustaining cost is the full cost of producing an ounce; at a record it puts efficiency under scrutiny.

Q2 — How much can one recovery point be worth?

On 100,000 oz/y at a US$1,620 spread, roughly US$1.62 million of gross margin.

Q3 — Which product addresses which lever?

AuCyan™ for dissolution, AuCarb™ for adsorption, AuLeach™ for route choice.

Q4 — What is the MOQ structure?

One 20-foot container: 18 MT cyanide, 15 MT carbon, 28 MT leaching agent.

Q5 — How is batch consistency documented?

A batch COA, TDS and MSDS accompany every shipment.

Q6 — How many countries do you serve?

More than 77, under FOB/CIF terms.

Build your efficiency model

Send your operations and ore types. We return a single qualification framework with cost-per-ounce logic.

Contact Us · Golden Triangle overview · Three-product overview · Chemical FAQs · Industry News

WhatsApp +86 173 9270 5576 · info@unitedchemicalcn.com

You may also like

Online message consultation

Add comment:

+8617392705576WhatsApp QR CodeScan QR code
Leave a message for consultation
Thanks for your message, we will contact you soon !